Announcement

Collapse
No announcement yet.

Stone House Construction.

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Cheers Paul.Graham, cant wait for the boredom to set in.
    Attached Files

    Comment


    • Aye Mitch, Either you photo shopped that first pic of the last 3 or you put on a bit of weight since I last saw ya

      Comment


      • Cheers Des.Had to spend a day cutting out the rebate for the double door step tread.Used a nine inch cutting wheel and a smaller grinder and a concrete bolester/chisel.The door step treads dont come with a drip groove, so cut that in,
        Attached Files

        Comment


        • Get the Doors stained and hung.
          Attached Files

          Comment


          • Back to the built in robes and ceiling/wall lining with Tas Oak VJ boards.These two pics show the basic plan.End cupboard space at end of hall wall. Ply board to be installed in between the two closely placed vertical studs. Then ply placed on the floor stud dividing both sides of the back to back robes.
            Attached Files

            Comment


            • Building the robes
              Attached Files

              Comment


              • Get the Doors stained and hung.You are doing a great job Mitch, I could even say your well hung ( for a door fitter).Graeme.

                Comment


                • Hey "Big Fella" you"ve bin as busy as a one armed brick layer in bagdad, the house is looking schmick. Matt.

                  Comment


                  • You are doing a great job Mitch, I could even say your well hung ( for a door fitter).Graeme.Not to mention his huge stones

                    Comment

                    Working...
                    X