Cheers Paul.Graham, cant wait for the boredom to set in.
Announcement
Collapse
No announcement yet.
Stone House Construction.
Collapse
X
-
Back to the built in robes and ceiling/wall lining with Tas Oak VJ boards.These two pics show the basic plan.End cupboard space at end of hall wall. Ply board to be installed in between the two closely placed vertical studs. Then ply placed on the floor stud dividing both sides of the back to back robes.
Comment
Comment